4cFully-integrated portfolio, programme, project, resource management and critical path analysis software Precedence Networks (PERT or CPM charts)A useful graphical alternative to the Gantt Chart which displays the project schedule, especially when drawing links between tasks (task sequences and dependencies) is the Precedence Network or PERT (Program Evaluation Review Technique) or CPM (Critical Path Method chart. It is designed to show the logical relationships between tasks, so it is also known as a Logic Chart.
In the 4c Precedence Network, tasks are represented by boxes, and the links by arrowed lines. Once the task dependencies have been defined, and the task durations have been specified, Critical Path Analysis will generate the project schedule, which can then be viewed on the Gantt chart. With the 4c Precedence Network chart you can:
Go Back |
|
|||||||||||||||||||||||||||||||
| Download our articles or run any of our on-line demos |
© 4c Systems Ltd 2010 ◊ Home ◊ Printing Tip ◊ Site Map ◊ Terms & Conditions ◊ Privacy Statement ◊ Links ◊ Trademarks |
All graphics (except third-party logos & screenshots) were designed & executed by Natalie Catchpole. |